CiocanestiĀ PV Plant, with an installed capacity of 2.7 MW, was acquired in 2020 by Alive Energy S.R.L., a company from the Alive group, together with the takeover of the assets of the company Green Power Energy Market S.R.L..
The park has been operational since 2013 and is located in the South part of Romania, occupying an area of approximately 90,000 square meters.